Please report any broken links or trouble you might come across to the Webmaster. Please take a moment to let us know so that we can correct any problems and Make Your Visit As Enjoyable And As Informative As Possible.

NavSource Online: Frigate Photo Archive

PF-105



Call sign:
Echo - Papa - Alpha - Hotel


PF-105 was built for Iran

PF-103 Class Patrol Frigate:

  • Laid down 1 May 1967 as PF-105 by Levingston Shipbuilding, Orange, TX
  • Launched 13 February 1968
  • Completed 12 October 1968
  • Transferred to Iran 10 December 1968 as Milanian (F 27)
  • Reclassified FS-83
  • Sunk in 1982 by Iraqi Naval Forces.

    Specifications:

  • Displacement 900 t., 1,540 t. (fl)
  • Length 299' 2"
  • Beam 32'
  • Draft 11'
  • Speed 20 kts.
  • Complement 133/140
  • Armament: Two 3"/50 Mk 34 dual purpose mounts, two 40mm mounts, one Hedgehog
  • Propulsion: Four diesel engines, two shafts.
    Click on thumbnail
    for full size image
    Size Image Description Source
    PF-105 245k Conducting Builders trials Joe Radigan
    PF-105 167k 6 December 1968
    Conducting Builders trials
    PF-105 144k c. 1969
    The destroyer tender USS Piedmont (AD-17) with the Iranian corvettes Milanian (F-27) and Kahnamoi (F-28) alongside
    U.S. Navy photo
    All Hands Magazine

    There is no DANFS history currently available for PF-105
    Back to the Main Photo Index Back to the Patrol Craft/Gunboat/Submarine Chaser Index Back to the Patrol Frigate (PF) Photo Index

    Comments, Suggestions, E-mail Webmaster

    This page created by Joseph M. Radigan and maintained by Tom Bateman
    All pages copyright NavSource Naval History